Showing posts with label Paint. Drills. And Hammers. Oh My.. Show all posts
Showing posts with label Paint. Drills. And Hammers. Oh My.. Show all posts

Friday, October 28, 2011

Not just pretty, but practical

I love seeing what other people can create with discarded items. I found this dresser mirror on CL for $20 and knew it was perfect for replicating what I had seen here. {I browse CL daily!}

I removed the mirror and gave the frame two coats of black paint {left over from this project}. Originally I was going to use ceiling tiles {I had access to some for FREE} as the "corkboard", but after some thought it seemed easier to just use foam board. The foam board was pricey {$10}, but because it was the same thickness as the mirror I removed, it was the perfect choice.

Once I cut it to size {use the mirror to trace the size onto the foam board then score with a utility knife...score both sides and then snap it apart} I covered it with linen fabric and stapled in place.


It was a perfect fit...


I replaced the original cardboard backing and stapled it into place.


I took my office space from drab...


to fab!


I was so happy to mark this project off my list.


The linen tote on the desk is my "mobile command center" that I love...idea found here. And I hang all the baby announcements and party invites we receive on my magnet board. A remnant of the HUGE magnet board we made for the playroom. Loving this space now.

Posted by Picasa

Friday, April 22, 2011

Billy's Baby: Nine Weeks Old

Another week has passed and we are soooooo close to being finished with the house!! It officially went on the market, along with the one where we are currently living, yesterday!! Woohoo!

Day 57
Hardwood floors - Day One, Light fixtures delivered, and Billy tried to prevent the forecasted torrential downpour from raining on our septic field line parade ;)





Day 58
Granite installed!!!!, Hardwood floors finished


Day 60
Interior doors hung, stain/sand front door





Day 61
Lots of work...and workers!!, Kitchen backsplash started, plumbing fixtures installed, bedroom lights installed





Day 62
Another day with lots of workers and SUNSHINE!! Vanity lights installed, propane tank installed, backsplash completed, icemaker installed






Day 63
Garage lights hung, Living Room lights hung, Front door lacquer applied


Major work that we need to complete:
install septic system and field lines
form drive, front porch, and patio and pour/finish concrete
hang vinyl on underside of roofline and ceilings of front porch and patio
finish HVAC work - waiting on concrete slab for AC unit

Minor work:
install carpet
hang exterior lights and install garage door key pad - when vinyl is complete
hang cabinet doors and install hardware
install door hardware
complete trim around fireplace
install shower door, glass transom, and glass for upper cabs {to be done first of next week!!}
install surround sound speakers
hang window blinds
hang bathroom mirrors and other hardware {robe hooks, TP holder, etc.}
CLEAN!!!!!!!! just waiting on Entergy to hook up power...the work order went in last week, but then the state was slammed with multiple storms resulting in THOUSANDS of power outages. I do believe we're not top priority, and rightly so!! haha It's crazy to see that we've come this far in just nine weeks...and that's with lots of bad, wet weather and a severely sick General Contractor!!! ;)

We could easily be looking at a completely finished house next Friday, with the exception of the septic and drive, of course.

Thursday, April 14, 2011

Billy's Baby: Eight Weeks Old

So I am VERY behind on blogging!! THREE weeks have passed since I last posted about the house.

Since then:

Billy was diagnosed with allergies and left on a mission trip to the Philippines

I was left as the woMAN in charge

Raegen was out of school for Spring Break

My dad came and helped me finish MANY, MANY projects around the house

I was very, VERY sore from working on those many projects!!

Lynden started walking

Billy returned from the Philippines and was worse for wear with his health...he returned to the doctor and they diagnosed him with asthma

Some wonderful ladies at church held a sweet baby shower for me and baby girl

We welcomed a new baby into the family

We celebrated a birthday within the family

Billy left for another trip, this time to Indiana to watch one of our favorite guys play baseball

Again, I was the woMAN in charge of the house

Billy returned home VERY sick

He made yet another trip to the doctor and it was confirmed he has pneumonia!! Work has sloooooowed drastically on the house, but we are still on schedule to be finished before baby girl arrives. Our greatest concern is the ground being too wet to put in our septic system. I "think" we have decided to dig a few trenches to drain the ground where needed and get that in place ASAP {before another BIG rain!!}. If that can get accomplished we could realistically be "move-in" ready at the end of April.


Here's the progress from the last THREE weeks!!



Day 36

More Cabs, pics of garage door and finished brick...










Day 40

ALL interior doors AND closet shelves hung, shower tile started, second garage door hung, granite ordered!!











Day 41

Crown installed and all windows framed








Day 43

Master shower tile started





Day 44

Paint!





Day 47

Shower tile, laundry & bath floor tile laid, paint almost finished - some trim left






Day 49

Paint




Also...looks like we're getting neighbors!!


I think that's gonna leave a rut!!



Day 50




Day 51

Kitchen Cabs



Raegen is most excited about this ramp...poor guy thinks it's staying!! :)



Day 52

Stain cabs





Day 55

more kitchen cabs!! They're almost complete!! Kitchen tile grouted and master bath surround tiled



Day 56

Trenches dug for electric and plumbing lines,

cab shelves delivered for staining, more tile work on bath surround, Vinyl Day One!



Shortly after I took this picture, the vinyl guys packed up and left...so, we're on the hunt for new vinyl guys!! hahaha...

Related Posts with Thumbnails

Sign my Guestbook!

Sugar and Spice or Snakes and Snails?

Poll has closed. It's a BOY!!!

Take the poll located on the right side of the screen. Will we be having another baby boy or a baby girl? What do you think?

If it's any help, I haven't had any dreams {like I did with Raegen, dreaming I was having a boy} and I just don't have that "feeling" with this baby. I did have severe morning sickness that lasted through week 15, quite unlike my mild morning sickness that ended at week 12 with Raegen. That info may help or confuse you more! I'm anxious to see what everyone else thinks we're having.


Is baby #3 a boy or a girl?